Intense rockburst impacts in deep underground construction and their prevention

  1. 1.
    SYSNO ASEP0447883
    Druh ASEPJ - Článek v odborném periodiku
    Zařazení RIVJ - Článek v odborném periodiku
    Poddruh JČlánek ve WOS
    NázevIntense rockburst impacts in deep underground construction and their prevention
    Tvůrce(i) Mazaira, Alejandro (UGN-S)
    Koníček, Petr (UGN-S) RID, ORCID
    Celkový počet autorů2
    Zdroj.dok.Canadian Geotechnical Journal - ISSN 0008-3674
    Roč. 52, č. 10 (2015), s. 1426-1439
    Poč.str.14 s.
    Forma vydáníOnline - E
    AkceInternational Colloquium on Geomechanics and Geophysics /5./
    Datum konání25.06.2014-27.06.2014
    Místo konáníKarolinka
    ZeměCZ - Česká republika
    Typ akceWRD
    Jazyk dok.eng - angličtina
    Země vyd.CA - Kanada
    Klíč. slovarockburst ; in situ stress ; induced stress ; destress blasting ; yielding support
    Vědní obor RIVDH - Báňský průmysl vč. těžby a zpracování uhlí
    CEPED2.1.00/03.0082 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    LO1406 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    Institucionální podporaUGN-S - RVO:68145535
    UT WOS000363475700003
    DOI10.1139/cgj-2014-0359
    AnotaceIn the last few decades, in both mining and civil engineering projects, deeper excavations have been carried out than in the past. With this increase in depth, rocks may overstress and rock failures can occur during excavation. When competent rock strata are encountered under high stress conditions, these failures can vary from superficial spalling to explosive rockburst. Intense rockbursts may cause fatal injuries to workers and significant loss of equipment and time. The occurrence of rockbursts is always difficult to predict and special steps and measures must be taken to control them. First, burst-prone zones must be predicted by an early exhaustive geological study and by the assessment of in situ stress level and orientation. Second, basic design parameters, e.g., shape, size, and excavation method, should be modified and adapted to the expected conditions to minimize rockburst risk. Third, in situ pre-conditioning methods, e.g., destress blasting, can be applied to decrease the capacity of the rock mass to store energy. Finally, special rock support and reinforcement systems, i.e., yielding systems, must be installed after excavation to ensure total stability of the opening.
    PracovištěÚstav geoniky
    KontaktLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Rok sběru2016
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.