Design, installation and commissioning of the ELI-Beamlines high-power, high-repetition rate HAPLS laser beam transport system to P3

  1. 1.
    SYSNO ASEP0552200
    Druh ASEPJ - Článek v odborném periodiku
    Zařazení RIVJ - Článek v odborném periodiku
    Poddruh JOstatní články
    NázevDesign, installation and commissioning of the ELI-Beamlines high-power, high-repetition rate HAPLS laser beam transport system to P3
    Tvůrce(i) Borneis, Stefan (FZU-D)
    Laštovička, Tomáš (FZU-D) RID, ORCID
    Sokol, Martin (FZU-D)
    Jeong, Tae Moon (FZU-D) ORCID
    Condamine, Florian P. (FZU-D) ORCID
    Renner, Oldřich (FZU-D) RID, ORCID
    Tikhonchuk, Vladimir (FZU-D) ORCID
    Bohlin, Hannes (FZU-D) ORCID
    Fajstavr, Antonín (FZU-D) ORCID
    Hernandez Martin, Juan C. (FZU-D) ORCID
    Jourdain, Noémie (FZU-D) ORCID
    Batheja, Deepak Kumar (FZU-D) ORCID
    Modřanský, David (FZU-D)
    Pokorný, Adam (FZU-D)
    Wolf, Adam (FZU-D) ORCID
    Zhai, Shuhua (FZU-D) ORCID
    Korn, Georg (FZU-D) RID, ORCID
    Weber, Stefan A. (FZU-D) RID, ORCID
    Celkový počet autorů18
    Číslo článkue30
    Zdroj.dok.High Power Laser Science and Engineering. - : Cambridge University Press - ISSN 2095-4719
    Roč. 9, June (2021)
    Poč.str.26 s.
    Jazyk dok.eng - angličtina
    Země vyd.GB - Velká Británie
    Klíč. slovabeam transport system ; cleanliness ; high-power laser ; laser commissioning ; laser–plasma experiment ; optomechanics ; stability ; X-ray ; user facility
    Vědní obor RIVBL - Fyzika plazmatu a výboje v plynech
    Obor OECDFluids and plasma physics (including surface physics)
    CEPEF16_019/0000789 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    EF15_003/0000449 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    Výzkumná infrastrukturaELI Beamlines III - 90141 - Fyzikální ústav AV ČR, v. v. i.
    Způsob publikováníOpen access
    Institucionální podporaFZU-D - RVO:68378271
    DOI10.1017/hpl.2021.16
    AnotaceThe design and the early commissioning of the ELI-Beamlines laser facility’s 30 J, 30 fs, 10 Hz HAPLS (High-repetitionrate Advanced Petawatt Laser System) beam transport (BT) system to the P3 target chamber are described in detail. It is the world’s first and with 54 m length, the longest distance high average power petawatt (PW) BT system ever built. It connects the HAPLS pulse compressor via the injector periscope with the 4.5 m diameter P3 target chamber of the plasma physics group in hall E3. It is the largest target chamber of the facility and was connected first to the BT system. The major engineering challenges are the required high vibration stability mirror support structures, the high pointing stability optomechanics as well as the required levels for chemical and particle cleanliness of the vacuum vessels to preserve the high laser damage threshold of the dielectrically coated high-power mirrors.
    PracovištěFyzikální ústav
    KontaktKristina Potocká, potocka@fzu.cz, Tel.: 220 318 579
    Rok sběru2022
    Elektronická adresahttps://doi.org/10.1017/hpl.2021.16
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.