Počet záznamů: 1
Design, installation and commissioning of the ELI-Beamlines high-power, high-repetition rate HAPLS laser beam transport system to P3
- 1.
SYSNO ASEP 0552200 Druh ASEP J - Článek v odborném periodiku Zařazení RIV J - Článek v odborném periodiku Poddruh J Ostatní články Název Design, installation and commissioning of the ELI-Beamlines high-power, high-repetition rate HAPLS laser beam transport system to P3 Tvůrce(i) Borneis, Stefan (FZU-D)
Laštovička, Tomáš (FZU-D) RID, ORCID
Sokol, Martin (FZU-D)
Jeong, Tae Moon (FZU-D) ORCID
Condamine, Florian P. (FZU-D) ORCID
Renner, Oldřich (FZU-D) RID, ORCID
Tikhonchuk, Vladimir (FZU-D) ORCID
Bohlin, Hannes (FZU-D) ORCID
Fajstavr, Antonín (FZU-D) ORCID
Hernandez Martin, Juan C. (FZU-D) ORCID
Jourdain, Noémie (FZU-D) ORCID
Batheja, Deepak Kumar (FZU-D) ORCID
Modřanský, David (FZU-D)
Pokorný, Adam (FZU-D)
Wolf, Adam (FZU-D) ORCID
Zhai, Shuhua (FZU-D) ORCID
Korn, Georg (FZU-D) RID, ORCID
Weber, Stefan A. (FZU-D) RID, ORCIDCelkový počet autorů 18 Číslo článku e30 Zdroj.dok. High Power Laser Science and Engineering. - : Cambridge University Press - ISSN 2095-4719
Roč. 9, June (2021)Poč.str. 26 s. Jazyk dok. eng - angličtina Země vyd. GB - Velká Británie Klíč. slova beam transport system ; cleanliness ; high-power laser ; laser commissioning ; laser–plasma experiment ; optomechanics ; stability ; X-ray ; user facility Vědní obor RIV BL - Fyzika plazmatu a výboje v plynech Obor OECD Fluids and plasma physics (including surface physics) CEP EF16_019/0000789 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy EF15_003/0000449 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy Výzkumná infrastruktura ELI Beamlines III - 90141 - Fyzikální ústav AV ČR, v. v. i. Způsob publikování Open access Institucionální podpora FZU-D - RVO:68378271 DOI 10.1017/hpl.2021.16 Anotace The design and the early commissioning of the ELI-Beamlines laser facility’s 30 J, 30 fs, 10 Hz HAPLS (High-repetitionrate Advanced Petawatt Laser System) beam transport (BT) system to the P3 target chamber are described in detail. It is the world’s first and with 54 m length, the longest distance high average power petawatt (PW) BT system ever built. It connects the HAPLS pulse compressor via the injector periscope with the 4.5 m diameter P3 target chamber of the plasma physics group in hall E3. It is the largest target chamber of the facility and was connected first to the BT system. The major engineering challenges are the required high vibration stability mirror support structures, the high pointing stability optomechanics as well as the required levels for chemical and particle cleanliness of the vacuum vessels to preserve the high laser damage threshold of the dielectrically coated high-power mirrors.
Pracoviště Fyzikální ústav Kontakt Kristina Potocká, potocka@fzu.cz, Tel.: 220 318 579 Rok sběru 2022 Elektronická adresa https://doi.org/10.1017/hpl.2021.16
Počet záznamů: 1