Počet záznamů: 1  

The DEMO wall load challenge

  1. 1.
    SYSNO ASEP0475959
    Druh ASEPJ - Článek v odborném periodiku
    Zařazení RIVJ - Článek v odborném periodiku
    Poddruh JČlánek ve WOS
    NázevThe DEMO wall load challenge
    Tvůrce(i) Wenninger, R. (DE)
    Albanese, R. (IT)
    Ambrosino, R. (IT)
    Arbeiter, F. (DE)
    Aubert, J. (FR)
    Bachmann, C. (DE)
    Barbato, L. (IT)
    Barrett, T. (GB)
    Beckers, M. (DE)
    Biel, W. (DE)
    Boccaccini, L. (DE)
    Carralero, D. (DE)
    Coster, D. (DE)
    Eich, T. (DE)
    Fasoli, A. (CH)
    Federici, G. (DE)
    Firdaouss, M. (FR)
    Graves, J. (CH)
    Horáček, Jan (UFP-V) RID, ORCID
    Kovari, M. (GB)
    Lanthaler, S. (CH)
    Loschiavo, V. (IT)
    Lowry, C. (BE)
    Lux, H. (GB)
    Maddaluno, G. (IT)
    Maviglia, F. (IT)
    Mitteau, R. (PT)
    Neu, R. (DE)
    Pfefferle, D. (CH)
    Schmid, K. (DE)
    Siccinio, M. (DE)
    Sieglin, B. (DE)
    Silva, C. (PT)
    Snicker, A. (DE)
    Subba, F. (IT)
    Varje, J. (FI)
    Zohm, H. (DE)
    Číslo článku046002
    Zdroj.dok.Nuclear Fusion. - : Institute of Physics Publishing - ISSN 0029-5515
    Roč. 57, č. 4 (2017)
    Poč.str.11 s.
    Forma vydáníTištěná - P
    Jazyk dok.eng - angličtina
    Země vyd.AT - Rakousko
    Klíč. slovaDEMO ; power loads ; first wall
    Vědní obor RIVBL - Fyzika plazmatu a výboje v plynech
    Obor OECDFluids and plasma physics (including surface physics)
    Institucionální podporaUFP-V - RVO:61389021
    UT WOS000405943600001
    EID SCOPUS85015769701
    DOI10.1088/1741-4326/aa4fb4
    AnotaceFor several reasons the challenge to keep the loads to the first wall within engineering limits is substantially higher in DEMO compared to ITER. Therefore the pre-conceptual design development for DEMO that is currently ongoing in Europe needs to be based on load estimates that are derived employing the most recent plasma edge physics knowledge. An initial assessment of the static wall heat load limit in DEMO infers that the steady state peak heat flux limit on the majority of the DEMO first wall should not be assumed to be higher than 1.0 MW m-2. This compares to an average wall heat load of 0.29 MW m-2 for the design assuming a perfect homogeneous distribution. The main part of this publication concentrates on the development of first DEMO estimates for charged particle, radiation, fast particle (all static) and disruption heat loads. Employing an initial engineering wall design with clear optimization potential in combination with parameters for the flat-top phase (x-point configuration), loads up to 7 MW m-2 (penalty factor for tolerances etc not applied) have been calculated. Assuming a fraction of power radiated from the x-point region between 1/5 and 1/3, peaks of the total power flux density due to radiation of 0.6-0.8 MW m-2 are found in the outer baffle region. This first review of wall loads, and the associated limits in DEMO clearly underlines a significant challenge that necessitates substantial engineering efforts as well as a considerable consolidation of the associated physics basis.
    PracovištěÚstav fyziky plazmatu
    KontaktVladimíra Kebza, kebza@ipp.cas.cz, Tel.: 266 052 975
    Rok sběru2018
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.