Počet záznamů: 1  

Selection of quasi-homogenous units of rock mass due to engineers classification systems (URF Bukov, Czech Republic)

  1. 1.
    SYSNO ASEP0517138
    Druh ASEPC - Konferenční příspěvek (mezinárodní konf.)
    Zařazení RIVD - Článek ve sborníku
    NázevSelection of quasi-homogenous units of rock mass due to engineers classification systems (URF Bukov, Czech Republic)
    Tvůrce(i) Koníček, Petr (UGN-S) RID, ORCID
    Souček, Kamil (UGN-S) RID, ORCID
    Vavro, Martin (UGN-S) RID, ORCID
    Staš, Lubomír (UGN-S) RID, ORCID
    Waclawik, Petr (UGN-S) RID
    Vavro, Leona (UGN-S) RID
    Vondrovic, L. (CZ)
    Celkový počet autorů7
    Zdroj.dok.Rock Mechanics for Natural Resources and Infrastructure Development - Full Papers, Proceedings in Earth and Geosciences, 6. - Leiden : CRC Press/Balkema, 2019 / da Fontoura Sergio A.B. ; Rocca Richardo Jose ; Pavón Mendoza José - ISSN 2639-7749 - ISBN 978-0-367-42284-4
    Rozsah strans. 583-589
    Poč.str.7 s.
    Forma vydáníTištěná - P
    AkceInternational Congress on Rock Mechanics and Rock Engineering (ISRM 2019) /14./
    Datum konání13.09.2019 - 18.09.2019
    Místo konáníFoz do Iguassu
    ZeměBR - Brazílie
    Typ akceWRD
    Jazyk dok.eng - angličtina
    Země vyd.NL - Nizozemsko
    Klíč. slovarock mass ; URF ; rock quality designation ; rock mass rating
    Vědní obor RIVDH - Báňský průmysl vč. těžby a zpracování uhlí
    Obor OECDMechanical engineering
    CEPLO1406 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    Institucionální podporaUGN-S - RVO:68145535
    AnotaceBukov Underground Research Facility (Bukov URF) was built as a test site to assess the properties and behavior of the rock mass analogous to select candidate sites for high-level radioactive waste disposal. During gates driving evaluation of rock mass quality was conducted by Rock Mass Rating, Rock Tunneling Quality and Rock Quality Designation indexes according geological and geotechnical mapping of the gates walls, drilling of the exploration boreholes, rock testing in lab and in-situ measurements. Main goal of the study was rock mass quality evaluation for underground experiments. In some gates where the pilot boreholes were not drilled the structural geological mapping of the gate walls was carried out to determine the Rock Quality Designation index. This methodology was adopted in the past and later verified for this laboratory in similar rock mass conditions. Main goal of the study - selection of quasi-homogenous units of rock mass - was realized.
    PracovištěÚstav geoniky
    KontaktLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Rok sběru2020
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.