Stress state rock mass monitoring ahead of longwall No. II/501/C, Mine Staszic-Wujek, PGG, Poland -Project RFCS DD-MET

  1. 1.
    SYSNO ASEP0564435
    Druh ASEPV - Výzkumná zpráva
    Zařazení RIVZáznam nebyl označen do RIV
    NázevStress state rock mass monitoring ahead of longwall No. II/501/C, Mine Staszic-Wujek, PGG, Poland -Project RFCS DD-MET
    Tvůrce(i) Waclawik, Petr (UGN-S) RID
    Kukutsch, Radovan (UGN-S) RID, ORCID
    Staš, Lubomír (UGN-S) RID, ORCID
    Souček, Kamil (UGN-S) RID, ORCID
    Vavro, Leona (UGN-S) RID
    Vavro, Martin (UGN-S) RID, ORCID
    Kubina, Lukáš (UGN-S)
    Schuchová, Kristýna (UGN-S) ORCID
    Celkový počet autorů8
    Vyd. údajeOstrava: Ústav geoniky AV ČR, v. v. i., 2022
    Poč.str.51 s.
    Forma vydáníTištěná - P
    Jazyk dok.eng - angličtina
    Země vyd.CZ - Česká republika
    Vydání1
    Klíč. slovapre-mining stress ; induced stress ; 3D laser scanning
    Vědní obor RIVDH - Báňský průmysl vč. těžby a zpracování uhlí
    Obor OECDEnvironmental and geological engineering, geotechnics
    Další zdrojneveřejné zdroje
    AnotaceFor designing precisely the reinforcement of mine gate and reinforcing underground structures in general, knowing stress and deformation states in the rock massive in the immediate vicinity of these mine works as precisely as possible is absolutely decisive. In order to verify the rock mass stress state and its changes induced by longwall mining, the monitoring of rock mass stress changing in connection with the mine out of the coal seam No. 501, longwall face No. II/501/C in the Mine Staszic-Wujek, Poland, was suggested. The aim of the contractual research was the realisation and interpretation of the rock stress state monitoring using the CCBO (Compact Conical ended Borehole Overcoring method) and CCBM (Compact Conical ended Borehole Monitoring method) probes in the forefield of mentioned longwall face within geotechnical station. To verify stress monitoring, the survey of the state of the longwall gate was carried out using a pulse 3D scanner. The purpose was to capture deformation changes ahead of the advancing longwall face, specifically, at five stages in the ± 20 m section on each side from the installed geotechnical station.
    PracovištěÚstav geoniky
    KontaktLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Rok sběru2023
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.