Monitoring of coal pillars yielding during room and pillar extraction at the great depth

  1. 1.
    0491705 - ÚGN 2019 RIV GB eng C - Konferenční příspěvek (zahraniční konf.)
    Waclawik, Petr - Kukutsch, Radovan - Koníček, Petr - Kajzar, Vlastimil
    Monitoring of coal pillars yielding during room and pillar extraction at the great depth.
    EUROCK 2018 - Geomechanics and Geodynamics of Rock Masses. London: CRC Press/Balkema, Taylor and Francis Group, 2018 - (Litvienko, V.), s. 711-718. ISBN 978-113861645-5.
    [EUROCK 2018 - Geomechanics and Geodynamics of Rock Masses. Saint Petersburg (RU), 22.05.2018-26.05.2018]
    Grant CEP: GA MŠMT ED2.1.00/03.0082; GA MŠMT(CZ) LO1406
    Institucionální podpora: RVO:68145535
    Klíčová slova: stress-deformation * monitoring * room and pillar * coal pillar * yielding * displacement
    Obor OECD: Mining and mineral processing
    https://onepetro.org/ISRMEUROCK/proceedings-abstract/EUROCK18/All-EUROCK18/ISRM-EUROCK-2018-097/448923

    A considerable amount of coal reserves are located in protection pillars that lie under built-up region in active mining areas at the Czech part of the Upper Silesian Coal Basin. The commonly used controlled caving longwall mining method is not applicable in these areas because significant deformation of the surface is not permitted. For this reason the room and pillar method with stable coal pillars has been tested in order to minimise subsidence of surface.
    Stress-deformation monitoring was essential as this was the first application of the conventional room and pillar mining method within the Upper Silesian Coal Basin mines. More than six kilometres of roadways were driven within two panels during last three years. To determine pillar stability, vertical stress and horizontal displacement of coal pillars were measured in coal pillars which are located within a row of pillars forming the panels. Two monitored pillars diamond in shape and slightly irregular sides have been observed into the first mined panel “V” and three monitored pillars have been observed into the second panel “II”. To measure the increase in vertical stress due to mining, hydraulic stress cells were installed in each coal pillar. The 5-level multipoint rib extensometers measured displacements of all sides within each monitored pillar. The results of stress-deformation monitoring allowed pillar loading and yielding characteristics to be described.

    Trvalý link: http://hdl.handle.net/11104/0285343

     
    Název souboruStaženoVelikostKomentářVerzePřístup
    UGN_0491705.docx62.5 MBAutorský preprintvyžádat
     
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.