Počet záznamů: 1  

In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor

  1. 1.
    0452056 - ÚFP 2016 CH eng J - Článek v odborném periodiku
    Kysela, J. - Entler, Slavomír - Vsolak, R. - Klabik, T. - Zlamal, O. - Bellin, B. - Zacchia, F.
    In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor.
    Fusion Engineering and Design. 98-99, October (2015), s. 1271-1275. ISSN 0920-3796. E-ISSN 1873-7196.
    [Symposium on Fusion Technology 2014(SOFT-28)/28./. San Sebastián, 29.09.2014-03.10.2014]
    Klíčová slova: In-pile testing * LVR-15 * PFW * Primary first wall * TW3
    Kód oboru RIV: BL - Fyzika plazmatu a výboje v plynech
    Impakt faktor: 1.301, rok: 2015
    http://www.sciencedirect.com/science/article/pii/S0920379615000678

    The TW3 in-pile rig enabled the thermal fatigue testing of ITER primary first wall mock-ups in the core of the nuclear reactor. This experiment investigated the neutron irradiation influence on the design performance under high heat flux testing. A thermal flux of 0.5 MW/m2 in the neutron field of the core of the LVR-15 nuclear reactor was applied. Within the scope of the tests with simultaneous neutron irradiation, the TW3 rig reached a record of 17,040 thermal cycles with the radiation damage in the range of 0.41-1.17 dpa depending on the material. Even after a high number of thermal cycles, while being irradiated by neutrons, no damage of the tested mock-ups was visually observed. Further testing and analysis will follow in the Forschungszentrum Juelich. This publication has been supported by the SUSEN ProjectCZ.1.05/2.1.00/03.0108 (ERDF)
    Trvalý link: http://hdl.handle.net/11104/0253065

     
     
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.