Počet záznamů: 1  

Monitoring of coal pillars yielding during room and pillar extraction at the great depth

  1. 1.
    SYSNO ASEP0491705
    Druh ASEPC - Konferenční příspěvek (mezinárodní konf.)
    Zařazení RIVD - Článek ve sborníku
    NázevMonitoring of coal pillars yielding during room and pillar extraction at the great depth
    Tvůrce(i) Waclawik, Petr (UGN-S) RID
    Kukutsch, Radovan (UGN-S) RID, ORCID
    Koníček, Petr (UGN-S) RID, ORCID
    Kajzar, Vlastimil (UGN-S) RID, ORCID
    Celkový počet autorů4
    Zdroj.dok.EUROCK 2018 - Geomechanics and Geodynamics of Rock Masses, Selected Papers from the 2018 European Rock Mechanics Symposium. - London : CRC Press/Balkema, Taylor and Francis Group, 2018 / Litvienko V. - ISBN 978-113861645-5
    Rozsah strans. 711-718
    Poč.str.6 s.
    Forma vydáníOnline - E
    AkceEUROCK 2018 - Geomechanics and Geodynamics of Rock Masses
    Datum konání22.05.2018 - 26.05.2018
    Místo konáníSaint Petersburg
    ZeměRU - Rusko
    Typ akceWRD
    Jazyk dok.eng - angličtina
    Země vyd.GB - Velká Británie
    Klíč. slovastress-deformation ; monitoring ; room and pillar ; coal pillar ; yielding ; displacement
    Vědní obor RIVDH - Báňský průmysl vč. těžby a zpracování uhlí
    Obor OECDMining and mineral processing
    CEPED2.1.00/03.0082 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    LO1406 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    Institucionální podporaUGN-S - RVO:68145535
    UT WOS000570546600097
    EID SCOPUS85061356865
    AnotaceA considerable amount of coal reserves are located in protection pillars that lie under built-up region in active mining areas at the Czech part of the Upper Silesian Coal Basin. The commonly used controlled caving longwall mining method is not applicable in these areas because significant deformation of the surface is not permitted. For this reason the room and pillar method with stable coal pillars has been tested in order to minimise subsidence of surface.
    Stress-deformation monitoring was essential as this was the first application of the conventional room and pillar mining method within the Upper Silesian Coal Basin mines. More than six kilometres of roadways were driven within two panels during last three years. To determine pillar stability, vertical stress and horizontal displacement of coal pillars were measured in coal pillars which are located within a row of pillars forming the panels. Two monitored pillars diamond in shape and slightly irregular sides have been observed into the first mined panel “V” and three monitored pillars have been observed into the second panel “II”. To measure the increase in vertical stress due to mining, hydraulic stress cells were installed in each coal pillar. The 5-level multipoint rib extensometers measured displacements of all sides within each monitored pillar. The results of stress-deformation monitoring allowed pillar loading and yielding characteristics to be described.
    PracovištěÚstav geoniky
    KontaktLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Rok sběru2019
    Elektronická adresahttps://onepetro.org/ISRMEUROCK/proceedings-abstract/EUROCK18/All-EUROCK18/ISRM-EUROCK-2018-097/448923
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.