Počet záznamů: 1
Complex assessment of reconstruction works on an institutional building: a case study
SYS 0492773 LBL 01000a^^22220027750^450 005 20240103220414.7 014 $a 85053208356 $2 SCOPUS 014 $a 000448098000079 $2 WOS 017 $a 10.1016/j.jclepro.2018.08.197 $2 DOI 100 $a 20180903d m y slo 03 ba 101 $a eng $d eng 102 $a GB 200 1-
$a Complex assessment of reconstruction works on an institutional building: a case study 215 $a 12 s. $c P 463 -1
$1 001 cav_un_epca*0258319 $1 011 $a 0959-6526 $e 1879-1786 $1 200 1 $a Journal of Cleaner Production $v Roč. 202, November (2018), s. 871-882 $1 210 $c Elsevier 610 $a thermal performance 610 $a carbon dioxide production 610 $a investments 610 $a payback period 610 $a energy savings 700 -1
$3 cav_un_auth*0234525 $a Fořt $b J. $y CZ $z K 701 -1
$3 cav_un_auth*0234732 $a Beran $b Pavel $i CET $j Centre of Exellence Telč $p UTAM-F $w Applied Sciences for Cultural Heritage $y CZ $T Ústav teoretické a aplikované mechaniky AV ČR, v. v. i. 701 -1
$3 cav_un_auth*0072030 $a Pavlík $b Z. $y CZ 701 -1
$3 cav_un_auth*0016778 $a Černý $b R. $y CZ 856 $u https://doi.org/10.1016/j.jclepro.2018.08.197
Počet záznamů: 1