Number of the records: 1
GREGOR solar telescope: Design and status
- 1.
SYSNO ASEP 0355356 Document Type J - Journal Article R&D Document Type Journal Article Subsidiary J Článek ve WOS Title GREGOR solar telescope: Design and status Author(s) Volkmer, R. (DE)
von der Lühe, O. (DE)
Denker, C. (DE)
Solanki, S.K. (DE)
Balthasar, H. (DE)
Berkefeld, T. (DE)
Caligari, P. (DE)
Collados Vera, M. (ES)
Fischer, A. (DE)
Halbgewachs, C. (DE)
Heidecke, F. (DE)
Hofmann, A. (DE)
Klvaňa, Miroslav (ASU-R) RID
Kneer, F. (DE)
Lagg, A. (DE)
Popow, E. (DE)
Schmidt, D. (DE)
Schmidt, W. (DE)
Sobotka, Michal (ASU-R) RID, ORCID
Soltau, D. (DE)
Strassmeier, K.G. (DE)Source Title Astronomische Nachrichten. - : Wiley - ISSN 0004-6337
Roč. 331, č. 6 (2010), s. 624-627Number of pages 4 s. Language eng - English Country DE - Germany Keywords instrumentation ; adaptive optics ; high angular resolution Subject RIV BN - Astronomy, Celestial Mechanics, Astrophysics CEZ AV0Z10030501 - ASU-R (2005-2011) UT WOS 000279751300019 DOI 10.1002/asna.201011388 Annotation The integration and verification phase of the GREGOR telescope reached an important milestone with the installation of the interim 1 m SolarLite primary mirror. This was the first time that the entire light path had seen sunlight. Since then extensive testing of the telescope and its subsystems has been carried out. The integration and verification phase will culminate with the delivery and installation of the final 1.5 m Zerodur primary mirror in the summer of 2010. Workplace Astronomical Institute Contact Radka Svašková, bibl@asu.cas.cz, Tel.: 323 620 326 Year of Publishing 2011
Number of the records: 1