Number of the records: 1  

GREGOR solar telescope: Design and status

  1. 1.
    SYSNO ASEP0355356
    Document TypeJ - Journal Article
    R&D Document TypeJournal Article
    Subsidiary JČlánek ve WOS
    TitleGREGOR solar telescope: Design and status
    Author(s) Volkmer, R. (DE)
    von der Lühe, O. (DE)
    Denker, C. (DE)
    Solanki, S.K. (DE)
    Balthasar, H. (DE)
    Berkefeld, T. (DE)
    Caligari, P. (DE)
    Collados Vera, M. (ES)
    Fischer, A. (DE)
    Halbgewachs, C. (DE)
    Heidecke, F. (DE)
    Hofmann, A. (DE)
    Klvaňa, Miroslav (ASU-R) RID
    Kneer, F. (DE)
    Lagg, A. (DE)
    Popow, E. (DE)
    Schmidt, D. (DE)
    Schmidt, W. (DE)
    Sobotka, Michal (ASU-R) RID, ORCID
    Soltau, D. (DE)
    Strassmeier, K.G. (DE)
    Source TitleAstronomische Nachrichten. - : Wiley - ISSN 0004-6337
    Roč. 331, č. 6 (2010), s. 624-627
    Number of pages4 s.
    Languageeng - English
    CountryDE - Germany
    Keywordsinstrumentation ; adaptive optics ; high angular resolution
    Subject RIVBN - Astronomy, Celestial Mechanics, Astrophysics
    CEZAV0Z10030501 - ASU-R (2005-2011)
    UT WOS000279751300019
    DOI10.1002/asna.201011388
    AnnotationThe integration and verification phase of the GREGOR telescope reached an important milestone with the installation of the interim 1 m SolarLite primary mirror. This was the first time that the entire light path had seen sunlight. Since then extensive testing of the telescope and its subsystems has been carried out. The integration and verification phase will culminate with the delivery and installation of the final 1.5 m Zerodur primary mirror in the summer of 2010.
    WorkplaceAstronomical Institute
    ContactRadka Svašková, bibl@asu.cas.cz, Tel.: 323 620 326
    Year of Publishing2011
Number of the records: 1  

  This site uses cookies to make them easier to browse. Learn more about how we use cookies.