Number of the records: 1  

Selection of quasi-homogenous units of rock mass due to engineers classification systems (URF Bukov, Czech Republic)

  1. 1.
    SYSNO ASEP0517138
    Document TypeC - Proceedings Paper (int. conf.)
    R&D Document TypeConference Paper
    TitleSelection of quasi-homogenous units of rock mass due to engineers classification systems (URF Bukov, Czech Republic)
    Author(s) Koníček, Petr (UGN-S) RID, ORCID
    Souček, Kamil (UGN-S) RID, ORCID
    Vavro, Martin (UGN-S) RID, ORCID
    Staš, Lubomír (UGN-S) RID, ORCID
    Waclawik, Petr (UGN-S) RID
    Vavro, Leona (UGN-S) RID
    Vondrovic, L. (CZ)
    Number of authors7
    Source TitleRock Mechanics for Natural Resources and Infrastructure Development - Full Papers, Proceedings in Earth and Geosciences, 6. - Leiden : CRC Press/Balkema, 2019 / da Fontoura Sergio A.B. ; Rocca Richardo Jose ; Pavón Mendoza José - ISSN 2639-7749 - ISBN 978-0-367-42284-4
    Pagess. 583-589
    Number of pages7 s.
    Publication formPrint - P
    ActionInternational Congress on Rock Mechanics and Rock Engineering (ISRM 2019) /14./
    Event date13.09.2019 - 18.09.2019
    VEvent locationFoz do Iguassu
    CountryBR - Brazil
    Event typeWRD
    Languageeng - English
    CountryNL - Netherlands
    Keywordsrock mass ; URF ; rock quality designation ; rock mass rating
    Subject RIVDH - Mining, incl. Coal Mining
    OECD categoryMechanical engineering
    R&D ProjectsLO1406 GA MŠMT - Ministry of Education, Youth and Sports (MEYS)
    Institutional supportUGN-S - RVO:68145535
    AnnotationBukov Underground Research Facility (Bukov URF) was built as a test site to assess the properties and behavior of the rock mass analogous to select candidate sites for high-level radioactive waste disposal. During gates driving evaluation of rock mass quality was conducted by Rock Mass Rating, Rock Tunneling Quality and Rock Quality Designation indexes according geological and geotechnical mapping of the gates walls, drilling of the exploration boreholes, rock testing in lab and in-situ measurements. Main goal of the study was rock mass quality evaluation for underground experiments. In some gates where the pilot boreholes were not drilled the structural geological mapping of the gate walls was carried out to determine the Rock Quality Designation index. This methodology was adopted in the past and later verified for this laboratory in similar rock mass conditions. Main goal of the study - selection of quasi-homogenous units of rock mass - was realized.
    WorkplaceInstitute of Geonics
    ContactLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Year of Publishing2020
Number of the records: 1  

  This site uses cookies to make them easier to browse. Learn more about how we use cookies.