Performance of a coal pillar at deeper cover: Field and simulation studies

  1. 1.
    SYSNO ASEP0504426
    Document TypeJ - Journal Article
    R&D Document TypeJournal Article
    Subsidiary JČlánek ve WOS
    TitlePerformance of a coal pillar at deeper cover: Field and simulation studies
    Author(s) Kumar, A. (IN)
    Waclawik, Petr (UGN-S) RID
    Singh, R. (IN)
    Ram, S. (IN)
    Korbel, J. (CZ)
    Number of authors5
    Source TitleInternational Journal of Rock Mechanics and Mining Sciences. - : Elsevier - ISSN 1365-1609
    Roč. 113, č. 1 (2019), s. 322-332
    Number of pages11 s.
    Publication formOnline - E
    Languageeng - English
    CountryGB - United Kingdom
    Keywordsstrength ; failure ; room and pillar
    Subject RIVDH - Mining, incl. Coal Mining
    OECD categoryMining and mineral processing
    R&D ProjectsLO1406 GA MŠMT - Ministry of Education, Youth and Sports (MEYS)
    Method of publishingLimited access
    Institutional supportUGN-S - RVO:68145535
    UT WOS000454150800029
    EID SCOPUS85058637629
    DOI10.1016/j.ijrmms.2018.10.006
    AnnotationExhaustion of coal reserve, extractable by conventional longwall method of working at Czech mines, provided an opportunity to try modified Room and Pillar method to extract high grade coal locked-up in larger shaft protection pillar at around 900m depth. The shaft pillar is divided into various Room and Pillar panels and the development process in a panel followed a constant gallery width of 5.2m and 3.5m height. This development in the shaft pillar by bolter miner resulted oblique and inclined pillars of 860–1225m2 area. Stability of these pillars is realised to be vital for optimum recovery of high-grade coal from these panels. No empirical formulation is found suitable for the design of pillars at such a depth. Therefore, an attempt is made to select a better representing one through comparative study of the available formulation. CMRI formula is found to be an alternative solution for designing pillars at this depth as it contains depth of cover as a design parameter.
    This parameter in the formulation is included to take care of the in situ stress conditions and compactness of the material at higher depth of cover. Further, a number of geo-technical instruments are installed in two pillars of Panel V for an analysis of their stability during the development. An attempt is made to develop a strainsoftening based numerical modelling approach, calibrated by field studies and CMRI empirical formulation, to assess pillar performance at deeper cover. This development is found to be helpful in pillar stability analysis, when the installed instruments ceased to work. Further, an apprehension of pillar failure by extrapolation of field results is not confirmed on simulated models. This paper briefly presents a discussion of difficulties involved in pillar design at higher depth followed by results of field and simulation conducted for the deep Czech mine.
    WorkplaceInstitute of Geonics
    ContactLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Year of Publishing2020