Number of the records: 1
In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor
- 1.Kysela, J. - Entler, Slavomír - Vsolak, R. - Klabik, T. - Zlamal, O. - Bellin, B. - Zacchia, F.
In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor.
Fusion Engineering and Design. 98-99, October (2015), s. 1271-1275. ISSN 0920-3796. E-ISSN 1873-7196.
[Symposium on Fusion Technology 2014(SOFT-28)/28./. San Sebastián, 29.09.2014-03.10.2014]
Impact factor: 1.301, year: 2015
http://www.sciencedirect.com/science/article/pii/S0920379615000678
http://hdl.handle.net/11104/0253065
Number of the records: 1