Number of the records: 1  

In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor

  1. 1.
    Kysela, J., Entler, S., Vsolak, R., Klabik, T., Zlamal, O., Bellin, B., Zacchia, F. In-pile testing of ITER first wall mock-ups at relevant thermal loading conditions in the LVR-15 nuclear research reactor. Fusion Engineering and Design. 2015, 98-99(October), 1271-1275. ISSN 0920-3796. E-ISSN 1873-7196. Available: doi: 10.1016/j.fusengdes.2015.01.040.
Number of the records: 1  

  This site uses cookies to make them easier to browse. Learn more about how we use cookies.