Number of the records: 1  

The new 1.5m solar telescope GREGOR: first light and start of commissioning

  1. 1.
    SYSNO ASEP0048053
    Document TypeC - Proceedings Paper (int. conf.)
    R&D Document TypeThe record was not marked in the RIV
    TitleThe new 1.5m solar telescope GREGOR: first light and start of commissioning
    TitleNový, 1,5m sluneční teleskop GREGOR: první světlo a zahájení zkušebního provozu
    Author(s) Volkmer, R. (DE)
    von der Lühe, O. (DE)
    Kneer, F. (DE)
    Staude, J. (DE)
    Berkefeld, T. (DE)
    Caligari, P. (DE)
    Halbgewachs, C. (DE)
    Heidecke, F. (DE)
    Schmidt, W. (DE)
    Soltau, D. (DE)
    Niclas, H. (DE)
    Wittmann, A. (DE)
    Balthasar, H. (DE)
    Hofmann, A. (DE)
    Strassmeier, K.G. (DE)
    Sobotka, Michal (ASU-R) RID, ORCID
    Klvaňa, Miroslav (ASU-R) RID
    Collados Vera, M. (ES)
    Source TitleGround-based and Airborne Telescopes. - Bellingham : SPIE - International Society for Optical Engineering, 2006 / Stepp L. M. - ISBN 0-8194-6345-0
    Pagess. 16-24
    Number of pages9 s.
    ActionAstronomical Telescopes and Instrumentation 2006
    Event date24.05.2006-31.05.2006
    VEvent locationOrlando, Florida
    CountryUS - United States
    Event typeWRD
    Languageeng - English
    CountryUS - United States
    Keywordssolar telescope Gregor
    Subject RIVBN - Astronomy, Celestial Mechanics, Astrophysics
    AnnotationThe integration of the three main silicon carbide mirrors into the new 1.5 m solar telescope GREGOR at Izana on Tenerife, Spain is planned during 2006. We expect first light at the end of 2006. A progress report about integration of the optics and mechanics and planning of the commissioning phase of the telescope and post focus instruments will be presented at the meeting.
    WorkplaceAstronomical Institute
    ContactAnežka Melichárková, bibl@asu.cas.cz, Tel.: 323 620 326
    Year of Publishing2007
Number of the records: 1  

  This site uses cookies to make them easier to browse. Learn more about how we use cookies.