Number of the records: 1
Geotechnical monitoring and mathematical modelling in medieval Mine Jeroným (Czech Republic)
- 1.0087465 - ÚGN 2008 RIV PL eng J - Journal Article
Hrubešová, E. - Kaláb, Zdeněk - Kořínek, R. - Žůrek, P.
Geotechnical monitoring and mathematical modelling in medieval Mine Jeroným (Czech Republic).
[Geotechnické monitorování a matematické modelování ve středověkém Dole Jeroným (Česká republika).]
Górnictwo i geoinzynieria. Roč. 31, č. 3 (2007), s. 183-190. ISSN 1732-6702
R&D Projects: GA ČR(CZ) GA105/06/0068
Institutional research plan: CEZ:AV0Z30860518
Keywords : geotechnical monitoring * mathematical modelling * Mine Jeroným
Subject RIV: DC - Siesmology, Volcanology, Earth Structure
The first steps towards the preservation of the system of workings of medieval Mine Jeroným in Čistá were taken in the nineties. Since the year 2001 it is check geomechanical measurements. A mathematical model selected parts of the mine working is built to help delimit critical points. Present results will be summarized in this contribution.
První kroky k zachování středověkého Dolu Jeroným byly provedeny v devadesátých letech. Od roku 2001 bylo zahájeno geomechanické měření. Matematický model vybraných částí důlního díla napomáhá k určení kritických bodů. Stávající výsledky jsou představeny v článku.
Permanent Link: http://hdl.handle.net/11104/0149302
Number of the records: 1