Počet záznamů: 1  

Modelling of interaction of bentonite based sealing element and host rock

  1. 1.
    SYSNO ASEP0465532
    Druh ASEPC - Konferenční příspěvek (mezinárodní konf.)
    Zařazení RIVD - Článek ve sborníku
    NázevModelling of interaction of bentonite based sealing element and host rock
    Tvůrce(i) Blaheta, Radim (UGN-S) RID, SAI, ORCID
    Hasal, Martin (UGN-S)
    Michalec, Zdeněk (UGN-S)
    Celkový počet autorů3
    Zdroj.dok.45. Geomechanik - Kolloquium. - Freiberg : Technische Universität Bergakademie Freiberg, Institut für Geotechnik, 2016 / Konietzky H. - ISSN 1611-1605
    Rozsah strans. 205-219
    Poč.str.15 s.
    Forma vydáníTištěná - P
    AkceGeomechanik - Kolloquium /45./
    Datum konání11.11.2016 - 11.11.2016
    Místo konáníFreiberg
    ZeměDE - Německo
    Typ akceWRD
    Jazyk dok.eng - angličtina
    Země vyd.DE - Německo
    Klíč. slovaDECOVALEX 2015 Project ; bentonite ; sealing ; rock
    Vědní obor RIVDH - Báňský průmysl vč. těžby a zpracování uhlí
    CEPLQ1602 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    Institucionální podporaUGN-S - RVO:68145535
    AnotaceThe motivation of the presented work is to increase understanding of hydro-mechanical pro-cesses in bentonite based sealing structures and the surrounding host rock. With this aim a series of SEALEX experiments were realized by IRSN in Tournemire underground rock la-boratory in France. The experiments were consequently simulated within the DECOVALEX 2015 project; see e.g. (Millard et al. [1] and [2]). In this paper, we briefly describe a hydro-mechanical model developed at the Institute of Geonics CAS within the DECOVALEX 2015 project and application of this model for simu-lation of the SEALEX PT-A1 experiment. We extend the work realised within DECOVALEX 2015 (described e.g. in Millard et al. [1] and [2]) by a more detailed modelling, which considers the composition of the sealing plug from prefabricated bentonite/sand made blocks and investigates the effects of gaps between the blocks. Whereas, the modelling described in [1] and [2] used 3D simulations to understand the HM processes in horizontal installation with originally asymmetric technical gap between the plug and surrounding rock, for the purpose of investigation of the role of gaps, a simplified 2D axisymmetric model is used.
    PracovištěÚstav geoniky
    KontaktLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Rok sběru2017
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.