The Influence of In-Situ Rock Mass Stress Conditions on Deformation and Load of Gateroad Supports in Hard Coal Mine

  1. 1.
    SYSNO ASEP0475782
    Druh ASEPC - Konferenční příspěvek (mezinárodní konf.)
    Zařazení RIVD - Článek ve sborníku
    NázevThe Influence of In-Situ Rock Mass Stress Conditions on Deformation and Load of Gateroad Supports in Hard Coal Mine
    Tvůrce(i) Lubosika, Z. (PL)
    Waclawik, Petr (UGN-S) RID
    Horák, P. (CZ)
    Wrana, A. (PL)
    Celkový počet autorů4
    Zdroj.dok.Procedia Engineering - ISRM European Rock Mechanics Symposium EUROCK 2017. - Amsterdam : Elsevier Ltd., 2017 / Koníček P. ; Souček K. ; Konečný P. - ISSN 1877-7058
    Rozsah strans. 975-983
    Poč.str.9 s.
    Forma vydáníOnline - E
    AkceISRM European Rock Mechanics Symposium EUROCK 2017
    Datum konání20.06.2017 - 23.06.2017
    Místo konáníOstrava
    ZeměCZ - Česká republika
    Typ akceWRD
    Jazyk dok.eng - angličtina
    Země vyd.NL - Nizozemsko
    Klíč. slovagateroad ; mining ; underground support ; measurements ; stress
    Vědní obor RIVDH - Báňský průmysl vč. těžby a zpracování uhlí
    Obor OECDMining and mineral processing
    CEPLO1406 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    ED2.1.00/03.0082 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    Institucionální podporaUGN-S - RVO:68145535
    UT WOS000416996000124
    DOI10.1016/j.proeng.2017.05.269
    AnotaceThe stress-strain state of the rock mass in the neighbourhood of the mining galleries is absolutely critical considering their behaviour particularly load and deformation. The stress-strain state can be affected by numerous geological and mining factors i.e. depth, mechanical parameters of the rock mass, the presence of faults, previous mining operations in case of multiple seam extraction and by the influence of the current longwall mining process. Considering this fact the advanced measurement plan was developed. The measurements were conducted in one longwall maingate of the Czech coal mines. The holistic investigation program consisted identification of initial rock mass stress tensor and monitoring of its changing during the approach of the longwall face. Two CCBO (modified overcoring) probes were installed to obtain pre-mining full stress tensor and afterwards three CCBM probes were installed to continuous monitoring stress state in rock mass ahead of advancing longwall. The triple height telltales and endoscopic methods were applied to monitor the behaviour of rockmass in close proximity of the gateroad. Hydraulic dynamometers and strain gauged rockbolts were used to determine the support load. Also the gateroad deformation observations were performed. The results of aforementioned measurements allowed to determine the potential relation between stress-strain rock mass state and behaviour of the investigated gateroad in coarse of longwall face approaching.
    PracovištěÚstav geoniky
    KontaktLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Rok sběru2018
    Elektronická adresahttp://www.sciencedirect.com/science/article/pii/S1877705817324098