Počet záznamů: 1  

Rock Bolting at the Room and Pillar Method at Great Depths

  1. 1.
    SYSNO ASEP0475743
    Druh ASEPC - Konferenční příspěvek (mezinárodní konf.)
    Zařazení RIVD - Článek ve sborníku
    NázevRock Bolting at the Room and Pillar Method at Great Depths
    Tvůrce(i) Waclawik, Petr (UGN-S) RID
    Šňupárek, Richard (UGN-S) RID
    Kukutsch, Radovan (UGN-S) RID, ORCID
    Celkový počet autorů3
    Zdroj.dok.Procedia Engineering - ISRM European Rock Mechanics Symposium EUROCK 2017. - Amsterdam : Elsevier Ltd., 2017 / Koníček P. ; Souček K. ; Konečný P. - ISSN 1877-7058
    Rozsah strans. 575-582
    Poč.str.8 s.
    Forma vydáníOnline - E
    AkceISRM European Rock Mechanics Symposium EUROCK 2017
    Datum konání20.06.2017 - 23.06.2017
    Místo konáníOstrava
    ZeměCZ - Česká republika
    Typ akceWRD
    Jazyk dok.eng - angličtina
    Země vyd.NL - Nizozemsko
    Klíč. slovabolting ; monitoring ; room and pillar
    Vědní obor RIVDH - Báňský průmysl vč. těžby a zpracování uhlí
    Obor OECDMining and mineral processing
    CEPLO1406 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    ED2.1.00/03.0082 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    Institucionální podporaUGN-S - RVO:68145535
    UT WOS000416996000074
    DOI10.1016/j.proeng.2017.05.220
    AnotaceA part of the coal reserves in the Karvina subbasin of the Upper Silesian Coal Basin is situated in protection pillars that lie under built-up areas. The longwall mining method is not suitable in these areas because significant deformation of the surface is not allowed. The room and pillar method with stable coal pillars has been proposed to minimise strata convergence. The method has been examined within the shaft protective pillar located in CSM-North Mine coal seam No. 30, where the mining depth ranged from 700 to 900 meters, being perhaps the deepest room and pillar panel in coal mining in the world [1–5]. As there is no relevant experience of using this method in the Upper Silesian Coal Basin, an extensive monitoring system has been implemented to enable the mining trial to continue safely. The monitoring is focused on the load-bearing capacity of the coal pillars and strata deformation changes induced by the room and pillar mining method. Precise monitoring was carried out in two adjacent coal pillars located within the row of pillars forming the panel. To monitor roof deformation, fourteen pairs of 5level multipoint extensometers monitored roof displacements and eleven strain-gauged rockbolts were installed at various locations. Seven hydraulic dynamometer load cells measured the cable bolt loads were installed at the roadway intersections around the monitored pillars. The integral constituent of the extraction method (using driving machines like the Bolter Miner) is bolting as the sole support system of the roadways. The contribution deals with the behaviour of roof bolting, including the loading of the bolts, yielding of the rock mass and convergence in the roadways. The monitored parameters´ database used to measure whether the room and pillar method is successful at this depth forms a necessary condition for verification of this method and its future application in conditions experienced in Upper Silesian Coal Basin.
    PracovištěÚstav geoniky
    KontaktLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Rok sběru2018
    Elektronická adresahttp://www.sciencedirect.com/science/article/pii/S1877705817323603
Počet záznamů: 1  