Počet záznamů: 1  

In situ stress determination from excavation-induced stress by the compact conical-ended borehole overcoring method

  1. 1.
    SYSNO ASEP0462327
    Druh ASEPC - Konferenční příspěvek (mezinárodní konf.)
    Zařazení RIVD - Článek ve sborníku
    NázevIn situ stress determination from excavation-induced stress by the compact conical-ended borehole overcoring method
    Tvůrce(i) Hastíková, Alice (UGN-S)
    Kolcun, Alexej (UGN-S) RID
    Staš, Lubomír (UGN-S) RID, ORCID
    Koníček, Petr (UGN-S) RID, ORCID
    Celkový počet autorů4
    Zdroj.dok.Rock Mechanics and Rock Engineering: From the Past to the Future, Proceedings of the 2016 ISRM International Symposium, EUROCK 2016. - London : CRC Press, Taylor and Francis Group, 2016 / Ulusay R. ; Aydan Ö. ; Gercek A. ; Hindistan H. A. ; Tuncay E. - ISBN 978-1-138-03265-1
    Rozsah strans. 1203-1206
    Poč.str.4 s.
    Forma vydáníTištěná - P
    AkceEUROCK 2016 - 2016 ISRM International Symposium
    Datum konání29.08.2016 - 31.08.2016
    Místo konáníCappadocia
    ZeměTR - Turecko
    Typ akceWRD
    Jazyk dok.eng - angličtina
    Země vyd.GB - Velká Británie
    Klíč. slovain situ stress determination ; excavation-induced stress ; compact conical-ended borehole overcoring method (CCBO instrument)
    Vědní obor RIVDH - Báňský průmysl vč. těžby a zpracování uhlí
    Obor OECDMining and mineral processing
    CEPLO1406 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    ED2.1.00/03.0082 GA MŠMT - Ministerstvo školství, mládeže a tělovýchovy
    Institucionální podporaUGN-S - RVO:68145535
    UT WOS000719660400085
    EID SCOPUS85001837225
    AnotaceThe Compact Conical Borehole Overcoring (CCBO) method originally developed in Japan to
    determine stress in rock has been widely used by the Institute of Geonics, Czech Academy of Sciences. Only one borehole is required to install the CCBO instrument, measure strains and determine the full stress tensor in rock mass. To determine the pre-mining stress around the circular tunnel in undisturbed hard rock, the measurement requires a borehole of certain length to install the CCBO cell in location where the excavation does not affect the stress field.To reduce the drilling and installation costs, the Institute is developing new theoretical solutions for a short borehole strain measurement method enabling the CCBO cell installation closer to the circular tunnel. The
    proposed semi-analytical approach uses the short borehole strain measurement results, theoretical calculations of stress distribution in the elastic medium around the circular tunnel and numerical modelling, to back analyze the probable pre-mining stress tensor. This approach enables determination of pre-mining stress obtained from the short borehole strain measurements in excavation-induced zone around underground opening. Discussed here are the theoretical calculation methods, numerical modelling results and a practical example of the pre-mining stress determination from the short borehole strain measurements using the CCBO instrument.
    PracovištěÚstav geoniky
    KontaktLucie Gurková, lucie.gurkova@ugn.cas.cz, Tel.: 596 979 354
    Rok sběru2017
Počet záznamů: 1  

  Tyto stránky využívají soubory cookies, které usnadňují jejich prohlížení. Další informace o tom jak používáme cookies.